PC / SERVER

HARDWARE | PC / SERVER

ERCPro basic configuration requires just a single PC, but to support a more complex system you will need a server connected to one or more PC workstations, depending on the characteristics and dimensions of the venue.
Listed below the minimum technical requirements for both server and PC workstations for a medium-sized facility.

PC
  • Processor: Intel Core Atom/i3/i5/i7
  • Hard Disk: 250 GB
  • Operating system: Windows 7pro/8.1pro
  • Serial port (for the Pit workstation): triple output
  • 4GB Ram
  • Network connection: 1000Mb
  • Full HD monitor
SERVER
  • Processor: Intel Core i5/i7
  • Hard Disk: 500 GB serial ATA
  • 8 GB Ram
  • 2 x 1000 Mb network cards
  • Operating system: Windows Server 2008/2010/2012
  • 1 x 1000 Mb professional switch with 8/24 serial ports
  • ADSL router